Drillhole
11:12 PM May 30, 2026

Silver Creek

SC-26-104

Drilling

Rig Rig 18

Hole Properties

Drill order
Current
Pad
SC-01
Rig
Rig 18
Prospect
Silver Creek
Core size
NQ
Azimuth / dip
53.0 / -58.0
Coordinates
487560.00 E 7086314.00 N
Start date
May 14, 2026
Last update
May 30, 9:35 PM
End date
-
Current depth 436.0 m
Planned depth 780.0 m
Next target ETA June 4, 2026 4.9 days away Main vein at 585.0 m
EOH ETA June 11, 2026 11.3 days away 344.0 m remaining
Rate model 30.5 m/day rig history by active day: 1007.3 m / 33 active rig-days
Directional plan 0.0 days

Add Update

You can view updates, but cannot add them.

Update History

  1. Depth update demo_maintainer Depth 436.0 +436.0 m Status Drilling

    Depth and status update from synthetic field data.

  2. Status update demo_maintainer Status Drilling

    Hole started in the public demo schedule.