Rigs Silver Creek
11:10 PM May 30, 2026

3 rigs

Drill Rigs

Rig 12

Active
Contractor
Northern Diamond Drilling
Type
Diamond
Holes
3
Average
37.1 m/day
Current
1704.5 m
Current hole
NR-26-105

Completed Holes

  1. NR-26-102May 17, 2026
  2. NR-26-101May 10, 2026

Upcoming

  1. No upcoming holes assigned.

Drilling Time Curves

1705 m / 46 days = 37.1 m/day

Synthetic public demo rig.

Rig 18

Active
Contractor
Summit Drilling
Type
Diamond
Holes
2
Average
30.5 m/day
Current
1007.3 m
Current hole
SC-26-104

Completed Holes

  1. SC-26-103May 23, 2026

Upcoming

  1. No upcoming holes assigned.

Drilling Time Curves

1007 m / 33 days = 30.5 m/day

Synthetic public demo rig.

Rig 24

Standby
Contractor
Valley Core Services
Type
Diamond
Holes
0
Average
28.0 m/day
Current
0.0 m
Next hole
-

Completed Holes

  1. No completed holes yet.

Upcoming

  1. No upcoming holes assigned.

Drilling Time Curves

0 m / 0 days

No depth curves yet.

Synthetic public demo rig.

3 rigs 3485.0 m planned 2711.8 m drilled