North Ridge
NR-26-105
DrillingRig Rig 12
Add Update
You can view updates, but cannot add them.
Update History
-
Depth update demo_maintainer Depth 384.0 +98.8 m Status Drilling
Depth and status update from the drill crew.
-
Depth update demo_maintainer Depth 285.2 +37.5 m Status Drilling
Depth and status update from the drill crew.
-
Depth update demo_maintainer Depth 247.7 +30.6 m Status Drilling
Reduced advance during bit change and ground conditioning.
-
Depth update demo_maintainer Depth 217.2 +26.6 m Status Drilling
Depth and status update from the drill crew.
-
Depth update demo_maintainer Depth 190.6 +28.5 m Status Drilling
Depth and status update from the drill crew.
-
Depth update demo_maintainer Depth 162.1 +21.8 m Status Drilling
Depth and status update from the drill crew.
-
Depth update demo_maintainer Depth 140.3 +20.8 m Status Drilling
No drilling on day shift while waiting on helper coverage.
-
Depth update demo_maintainer Depth 119.5 +19.5 m Status Drilling
Depth and status update from the drill crew.
-
Depth update demo_maintainer Depth 100.0 +24.0 m Status Drilling
Depth and status update from the drill crew.
-
Depth update demo_maintainer Depth 76.0 +18.5 m Status Drilling
Depth and status update from the drill crew.
-
Depth update demo_maintainer Depth 57.5 +14.5 m Status Drilling
Short shift while water line repairs were completed.
-
Depth update demo_maintainer Depth 43.0 +19.8 m Status Drilling
Depth and status update from the drill crew.
-
Depth update demo_maintainer Depth 23.3 +23.2 m Status Drilling
Depth and status update from the drill crew.
-
Status update demo_maintainer Status Drilling
Hole started. Casing set and drilling underway.