Pads Silver Creek
11:11 PM May 30, 2026

6 pads

Drill Pads

Pad Map

NR-01 NR-02 SC-01 SC-02 WF-01 WF-02
Legend Active Planned Building

North Ridge

NR-01

Active
Depth
1320.5 / 1320.0 m 100%
Access
North Ridge switchback
Elevation
1280.0 m
UTM
486030 E7085010 N

Assigned Holes

  1. NR-26-101Completed
  2. NR-26-102Completed

Synthetic public demo pad.

NR-02

Ready
Depth
384.0 / 820.0 m 47%
Access
North Ridge upper bench
Elevation
1280.0 m
UTM
486290 E7085270 N

Assigned Holes

  1. NR-26-105Drilling

Synthetic public demo pad.

Silver Creek

SC-01

Active
Depth
1007.3 / 1345.0 m 75%
Access
Silver Creek west pad
Elevation
1280.0 m
UTM
487560 E7086350 N

Assigned Holes

  1. SC-26-104Drilling
  2. SC-26-103Completed

Synthetic public demo pad.

SC-02

Ready
Depth
0.0 / 725.0 m 0%
Access
Silver Creek lower road
Elevation
1280.0 m
UTM
487850 E7086560 N

Assigned Holes

  1. SC-26-P07Planned

Synthetic public demo pad.

West Fork

WF-01

Building
Depth
0.0 / 640.0 m 0%
Access
West Fork spur
Elevation
1280.0 m
UTM
486650 E7084620 N

Assigned Holes

  1. WF-26-106Preparing

Synthetic public demo pad.

WF-02

Permitted
Depth
0.0 / 675.0 m 0%
Access
West Fork ridge
Elevation
1280.0 m
UTM
487120 E7084880 N

Assigned Holes

  1. WF-26-P08Planned

Synthetic public demo pad.

6 pads 5525.0 m planned 2711.8 m drilled